One pipelayer was crushed to death and another injured when a trench collapsed. They were laying sewer pipe in a trench four feet (1.22 meters) wide at the bottom and 15 feet (4.57 meters) wide at the top. It was not shored or otherwise supported to prevent a cave-in. The soil in the bottom part of the trench was mostly sand and gravel and the upper portion was clay and loam. The trench was not protected from the vibration of heavy vehicle traffic on a nearby road. To exit the trench, the workers had to climb over backfill. When they tried […]
This content is for CoAction Insurance policy holders.
To request portal access, send an email to losscontrol@coactionspecialty.com with “Coaction LC Portal” in the subject line and include your policy number in the email body.
New Safety Talks
New Safety Talks
wpengine2026-03-14T14:19:53-07:00
Infant & Toddler Sleep Safety Reducing Sids And Nap-Time Risks Meeting Kit – French
wpengine2026-03-14T14:19:44-07:00
Infant & Toddler Sleep Safety Reducing Sids And Nap-Time Risks Meeting Kit – Spanish
wpengine2026-03-14T14:19:34-07:00
Infant & Toddler Sleep Safety Reducing Sids And Nap-Time Risks Meeting Kit
wpengine2026-03-11T20:35:56-07:00
Medication, Allergies, and Anaphylaxis: What Every Educator Must Know Meeting Kit – French
wpengine2026-03-11T20:35:38-07:00
Medication, Allergies, and Anaphylaxis: What Every Educator Must Know Meeting Kit – Spanish
wpengine2026-03-11T20:31:57-07:00
Medication, Allergies, and Anaphylaxis: What Every Educator Must Know Meeting Kit
New eLearning
wpengine2026-03-14T14:16:30-07:00

