Electrical contracting safety audit checklist on proper handling of electrical equipment.
De-Energize
- Are electrical appliances such as grounded?
- Are ground fault circuit interrupters installed on each temporary 15 or 20 ampere, 120 volt AC circuit at locations with construction ormodifications?
- Do you have electrical installations in hazardous dust or vapor areas that meet NEC code?
- Are disconnecting means always opened before fuses are replaced?Are all electrical raceways and enclosures securely fastened in place?
- Are all energized parts of electrical circuits and equipment guarded against accidental contact by approved cabinets or enclosures?
- Are disconnecting switches for electrical motors in excess of two horsepower able to open […]
This content is for CoAction Insurance policy holders.
To request portal access, send an email to losscontrol@coactionspecialty.com with “Coaction LC Portal” in the subject line and include your policy number in the email body.
New Safety Talks
New Safety Talks
wpengine2026-03-14T14:19:44-07:00
Infant & Toddler Sleep Safety Reducing Sids And Nap-Time Risks Meeting Kit – Spanish
wpengine2026-03-14T14:19:34-07:00
Infant & Toddler Sleep Safety Reducing Sids And Nap-Time Risks Meeting Kit
wpengine2026-03-11T20:35:38-07:00
Medication, Allergies, and Anaphylaxis: What Every Educator Must Know Meeting Kit – Spanish
wpengine2026-03-11T20:31:57-07:00
Medication, Allergies, and Anaphylaxis: What Every Educator Must Know Meeting Kit
New eLearning
wpengine2026-03-14T13:27:49-07:00
FUNDAMENTAL 55: Preventing Workplace Harassment for Employees – Spanish
Upcoming Events & Webinars
Vicky Pickford2026-01-12T22:46:54-08:00

