Electrical contracting safety audit checklist on proper handling of electrical equipment. De-Energize
- Are electrical appliances such as grounded?
- Are ground fault circuit interrupters installed on each temporary 15 or 20 ampere, 120 volt AC circuit at locations with construction ormodifications?
- Do you have electrical installations in hazardous dust or vapor areas that meet NEC code?
- Are disconnecting means always opened before fuses are replaced? Are all electrical raceways and enclosures securely fastened in place?
- Are all energized parts of electrical circuits and equipment guarded against accidental contact by approved cabinets or enclosures?
- Are disconnecting switches for electrical motors in excess of […]
This content is for CoAction Insurance policy holders.
To request portal access, send an email to losscontrol@coactionspecialty.com with “Coaction LC Portal” in the subject line and include your policy number in the email body.
New Safety Talks
New Safety Talks
New eLearning
wpengine2025-12-11T00:22:10-08:00
Fire Extinguishers: Monthly Inspections – Small Checks, Big Safety – French
wpengine2025-12-11T00:12:48-08:00
Fire Extinguishers: Monthly Inspections – Small Checks, Big Safety – Spanish
wpengine2025-11-24T21:46:31-08:00
Emergency Eyewashes and Safety Showers: A Deep Dive into Preparedness (French)
wpengine2025-11-24T21:29:57-08:00